|
Royal Tiger Mill & Mine Site
The IXL/Royal Tiger Mine site design/build project was to improve water quality and fish habitat in the Swan River by diverting stream flow away from mine tailings bordering the stream and realign connection to the north stem of the Swan. The design process included schematic design, conceptual design, preliminary final design, and final construction drawings submitted to Summit County, CDPHE, and Town of Breckenridge for approval in accordance with VCUP requirements. After we quickly attained the “no-further-action” determination from the CDPHE, the Project Manager for Summit County’s Open Space and Trails department, said to SMITH, “Thank you all for your assistance in making these projects successful.” |
